Production Cycle
- Preparation of material and hull components.
- Assembly and welding of aluminium structures.
- Engine installation and equipment integration.
- Testing, customer acceptance and boat handover.
Documented Processes
Production procedures cover material preparation, assembly, welding and quality control. Welding WPS/WPQR procedures are qualified under Bureau Veritas supervision; their applicability is determined by the conditions of each project.
Technical parameters are provided for preliminary assessment. Suitability for a particular vessel, equipment item and project is confirmed by the shipyard when agreeing the work.
Discuss Project Feasibility

