ASABA has equipment for testing towing appliances and conducting Bollard Pull tests. The work programme is determined by the equipment type, technical requirements and applicable authorisation documents.

200 t dynamometer rated load
2 G2140 shackles · CCS

Bollard Pull — Static Towing Force

ASABA measures vessel bollard pull, including after main engine repairs. The work programme and permissible load of the complete test arrangement are agreed for each vessel.

Towing Equipment Testing

Towing appliance checks follow an agreed programme. After machinery repairs, the harbour trials and, where required, sea trials specified in the programme are performed and the results documented. The appliance type, functions to be checked and permissible loads are confirmed before work begins.

Certified Test Rigging

The equipment includes two G2140 shackles with a safe working load of SWL 200 t and a CCS marine product certificate. Both shackles have passed magnetic particle testing.

EquipmentSpecifications
HZ-W8-200t Wireless DynamometerRated load 200 t
G2140 shackles · 2 unitsSWL 200 t · CCS certificate · magnetic particle testing

Documentation on Request

The shipyard holds a licence for the relevant work. Current certificates and supporting documents are available on request. The programme and permissible loads are agreed before testing begins.

Test Arrangements

The mooring arrangement, measuring equipment, technical programme, harbour conditions and attendance of customer or classification society representatives are agreed in advance. For an initial assessment, please send the vessel particulars, a description of the towing appliance and the required type of test.

Facilities & Infrastructure

Quay Infrastructure

Technical parameters are provided for preliminary assessment. Suitability for a particular vessel, equipment item and project is confirmed by the shipyard when agreeing the work.